Expansion of My Home Limestone Mine-II (ML Area: 252.407 Ha.)for Increase of Limestone Production from 1.0 to 1.40 Million Tonnes Per Annum (MTPA) with Total Excavation 1.45 MTPA (Limestone: 1.40 MTPA + Top Soil: 0.05 MTPA)and installation of New crusher of 1400 TPH capacity inside the ML Area at Mellacheruvu & Yepalamadhavaram(V’s), Mellacheruvu (M), Suryapet (D), Telangana, applied as per MOEFCC OM dated 11.04.2022 and 30.05.2022, under para 7(ii)(a)of EIA Notification, 2006. | realIQ